Duration (Weeks) | Assignment Name and brief description of main Deliverables and outputs | Name of Client and Country of Assignment. | Approx. Contract Value ₦ Amount paid to your firm. | Role on the Assignment. |
18 Months (Completed) | Shoreline Protection and Land Reclamation Project.
| Toru-Ebi Konsult for Ecological Fund Office, Abuja, Nigeria. | Approx. Contract sum ₦ 4,008,991,840.00 Consultant Fee ₦ 88,000,000.00 | Preparation of :
|
10 weeks (Completed) | Study and Design of Feed Mill | Niger Delta Basin Development Authority, Rivers State, Nigeria. | Approx. Contract sum ₦ 127,919,189.16 Consultant Fee ₦ 8,060,200.01 | Preparation of :
|
5 months (Completed) | Commisioning as Design and Supervising Consultants.
| Niger Delta Basin Development Authority. | Approx. Contract sum Consultant Fee ₦40,000,000.00 | Preparation of :
|
- Construction of Chemical Engineering Labouratory at Delta University,Amassoma, Bayelsa State.
Sand backfill in progress
Sand trip delivered to site for backfilling
Iron monger for tie-beam for oversite concrete
Sandcrete blocks for wall construction
2. Construction of 850m Flood Protection work at Emadike, Ogbia LGA Bayelsa State.
Sand backfill to steel sheet pile wall
Cnstruction of formwork to Capping beam
Completed Flood Protection Wall
3. Construction of the supervision of Unity Bridge Nembe (Link Bridge Bassambiri and Ogbolomabiri Communities).
Bridge Nembe under construction
Unity Bridge Nembe under construction
Unity Bridge Nembe under construction: Lauching of Precast Reinforced Concrete Girders.
Completed Nembe Unity Bridge.
4. Pumphouse Foundation Construction at Soku Gas Plant.
Excavation for foundation of Pump-house at Soku Gas plant
Commenced concrete Blinding of the foundation at the Soku Gas Plant
Blinding in Progress
Lifting Reinforcement cage in position- Soku Gas plant
Reinforcement cage lowered on to concrete blinding
Reinforcement Cage in place, Ready for concrete pump house
Reinforcement Cage for second foundation being placed in position
5. Construction of Asphalted foundation for Sheel Tank at Energia Nigeria Limited.
Energia Nigeria Limited:
Backfilling to Ring foundation for 10,000 Barrels of Crude Storage Tank
Energia Nigeria Limited:
Waterproof membrane over sandfill preparation for concreting
Energia Nigeria Limited:
Segmentation for concreting
Energia Nigeria Limited:
Concreting in Progress
Energia Nigeria Limited:
Finished foundation Asphalted for Steel Tank Construction
Energia Nigeria Limited:
10,000 Barrel Crude oil storage tank completed ready for Steel tank construction
6. Engineering and Consultancy services at Chawthorne channel Gas plant.
Chawthorne Channel Gas plant
Chawthorne Channel Gas plant
Chawthorne Channel Gas plant
Chawthorne Channel Gas plant
Chawthorne Channel Gas plant
Chawthorne Channel Gas plant
7. Rivers State University Medical Pathology Building, Port Harcourt.
Medical Pathology Building
Medical Pathology Building
Medical Pathology Building
Medical Pathology Building
Medical Pathology Building
8. Telecom Mast Foundation Construction.
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
Telecom Mast Foundation Construction
9. Emadike Shoreline-Reclamation Pix To NDDC